The corresponding water surface drop in the Red River is about 32 feet, a difference of some 14 feet. Therefore, a drop structure is required to reduce the potential energy Its the water and to provide an outlet alignment that will not induce scour in the river downstream of the junction point at Lockport.

This structure, as you can see from the photograph, is constructed of mass concrete with a concrete rollway and stilling basin incorporated into the design. The whole floodway allows all the water in the Red River to flow through the City of Winnipeg during normal summer, fall and winter months. But in the spring, when the discharge is greater than 30, cubic feet per second, then the water flow is divided between the Red River and the Floodway.

The amount of water diverted into the floodway is regulated by a control structure. During a wet spring the road under the Floodway Bridge spanning Highway No. Just east of the floodway off hwy. The major events in summer are the many mini-bike trails, target practice, rock hounds, training of dogs obedience and picnics, and just going for walks on a nice summers day. In winter, the slopes offer a grand place for tobogganing, sleighs and the novice skiing public.

Crazy Carpets are fun and you can see them twirling down the two levels of hills. Snowmobiles use this area greatly and you can hear them straining up and down, all in a long row, breaking a fresh trail after a heavy snowfall. The hay which grows is cut in the fall and you can view the huge hay bales dotting the landscape. People from the city come out in great numbers to wash their vehicles in the floodway waters.

The residents of St. Clements have trails that cross the floodway all along its route at the north-end. One in particular, at about Dunning Road off of No.

There was a nice elevation for crossing. Then the dredge cleaned out the channel and deepened it, causing a few surprises, we might add, to those unaware. However, people relocated the rocks and made new crossings, to cut off the distance from Henderson to Hwy. There have been several feasibility studies researching the recreational possibilities of this floodway, but nothing has been organized as of this date. Sandy Point was approximately six miles from our home.

Canadian Society for Civil Engineering. Construit originalement entre et Robert W. Engineer: H. Date of construction: October Location of Red River Floodway Source: www. Flood Inlet Control Structure, looking west. Source: A. The St. Source: CSCE. The hydraulic, mechanical and electrical machines were also upgraded.

Two hydraulic petroleum cylinders were replaced with containers containing vegetable oil. The outlet control structure was also expanded to twice its size, adding erosion protection measures and building baffle blocks to reduce the speed of water. Railway and highway bridges were elevated, replaced and upgraded. Improvements were made for some bridges and drainage structures and crossings such as the city of Winnipeg aqueducts and the Seine River siphon were modified.

The West Dike was extended to 11km and raised up to 1. Ditch grading, culverts and rock rip-rap were installed to check erosion. The entire expansion involved 21 million cubic metres of earthworks. More than companies and 3, workers were involved in the project. MMM Group was responsible for the replacement and upgrading of the six railway bridges crossing the floodway. Water Technology is using cookies We use them to give you the best experience.